Friday, July 18, 2008

July 18th, Concrete poured, half bath framed

Concrete was poured today for the patio and gazebo. Denis is wetting it down for the "slow cure".


Wetted down like this is kind of looks like a little pool. By the end of this hot day I was wishing it was a pool of cool water.



Upstairs in the pool room (the game, nothing to do with water), the half bath got framed in.



The old carpet and subfloor got torn out of the living room. Here is the result, to be hauled off to the burn pile tomorrow.


No comments: